- Home
- /
- News
- /
- Wind power
- /
- December 2014
Wind power News for December 2014
Addition brings Pattern Energy's portfolio to 12 wind projects with a total owned capacity of 1,636 MW.
26 December, 2014
18MW Gowon wind farm to support Korea’s aim to have renewable energy account for 20% of total electricity generated by 2020.
23 December, 2014
Latest order entails 32 V164-8.0 MW turbines for the offshore Burbo Bank Extension project in Liverpool Bay.
22 December, 2014
New projects entail the start of commercial operation of the onshore wind farm Grandview I in the Texas Panhandle and the kick-off of a solar plant in Fort Huachuca, Arizona.
22 December, 2014
The design aims to catalyze domestic manufacturing growth by removing barriers to entry faced by American steel fabricators that want to supply foundations for the offshore wind industry.
22 December, 2014
Deal calls for GE to supply Lewandpol Company with 27 GE 2.5-103 MW wind turbines for the Galicja Wind Farm.
18 December, 2014
Next-generation systems enable remote management of all makes of turbines.
17 December, 2014
Programme aims to extend operational life of Gamesa’s G47 wind turbine model to up to 30 years.
16 December, 2014
Project said to be the largest electricity storage facility of its type in the region.
15 December, 2014
The contract - worth several million pounds - is for the design, manufacture, supply, install, test and commission of technology to support Scottish Power in the delivery of over 215MW of renewable energy.
12 December, 2014
National College for Wind Energy aims to tackle skills gap and create jobs.
12 December, 2014
Documents represent an important step towards fulfilling the association's ambition to provide leadership on the HSE challenges facing the rapidly-growing offshore wind industry.
10 December, 2014
Move bodes well for wind energy sector in the short term, but falls short of desired goal of a two-year extension.
09 December, 2014
Eight-year agreement includes the maintenance of 66 wind turbines of Gamesa 2.0 MW-2.5 MW platform.
03 December, 2014
Brochures aim to provide authorities the requested transparency on the environmental performance of Siemens' wind products.
01 December, 2014
More than £380,000 awarded to projects across the country.
01 December, 2014